Test method
In the fast transient/burst test, is the application mode common-mode application or normal-mode application?
The fast transient/burst test is common-mode application (test). With our fast transient/burst test generator (FNS-AX4 series), normal-mode testing can now be performed by using the optional normal-mode coupling balun (15-00013A).
When testing a device with multiple signal ports during an IEC 61000-4-4 test, should noise be applied by clamping each line individually with the capacitive coupling clamp, or should multiple lines be clamped together and tested? For example, a device wi
Perform the test one line at a time. For ports with the same function, test one representative port, and treat the other ports as the same type of port; testing of the other ports is not performed. If the functions are different (for example, ...
Is it acceptable to test a tabletop EUT on a ground plane installed on the floor?
It is acceptable to perform the test.
How should equipment be arranged for a large EUT that cannot be placed on the test table?
Place an insulating support stand (height 0.1 m) on the ground plane, place the EUT on it, and perform the test.
If there is no clear distinction between floor-standing and tabletop types for the EUT, how should the test equipment arrangement be determined?
If there is no clear distinction between floor-standing and tabletop types for the EUT, the decision is often made by considering the installation conditions in actual use, such as the impedance to GND. If various patterns are possible, perform both ...
In the wiring for IEC 61000-4-4, the height of the power line between the test generator and the EUT is specified as 10 cm. How should the height between the primary side and the test generator be considered when arranging the setup?
Although it is not explicitly specified in the standard, we recommend arranging the primary side to test generator section at a height of 10 cm as well, and the cable length must also be defined so that it is the same each time. [Reason] In ...
If the EUT has no FG, it says that the ground plane is not connected. If the earth is floating, through what path is the noise applied?
In a common-mode test where there is no FG connection, the noise passes through the inside of the EUT, is capacitively coupled between grounds, and flows to SG.
How should testing be performed for an EUT with an AC adapter during IEC 61000-4-4 testing?
IEC61000-4-4 does not provide any special specification for the test method for an EUT with an AC adapter. The following two points specified in the standard are considered. 1. The distance between the simulator and the EUT is 50cm. 2. Each part of ...
In the standard, when testing signal lines, the EUT power line is taken from a separate line (without passing through the simulator). Considering test efficiency, is it acceptable to evaluate by passing the power line through the simulator's EUT line?
There is no problem, but when testing the power line, please pay attention to the cable distance from the simulator line output section to the EUT (it must be separated 50cm from the EUT). For tabletop EUT: 0.5m -0m/+0.1m For floor-standing EUT: 1m ...
For a DC-driven EUT, is there any case where the test is applied to PE?
Noise escapes toward the side with lower impedance, so depending on the surrounding environment and the lengths of other wiring, noise may propagate through the earth wire. However, we cannot guarantee whether the noise components propagating in the ...
Can the fast transient/burst test be used as a substitute for an impulse noise test?
The fast transient/burst test cannot be used as a substitute for an impulse noise test.
If the EUT is DC battery-powered and the side to which the test is applied has voltage, how should the fast transient/burst test be performed?
With our fast transient/burst simulators, almost no current from the battery flows through the coupling capacitor into the generator section, so it can be connected as is without issue.
How should the coupling clamp be used?
Place the coupling clamp on the ground plane and adjust it so that the coupling capacitance between the coupling clamp and the cable is maximized (so that the gap between the coupling clamp and the cable is minimized).
How should I proceed if the cable length is shorter than the standard specifies for the capacitive coupling test in IEC 61000-4-4?
Testing is not required. This test assumes a scenario where power cables and signal lines are bundled and run parallel, and noise from the power lines is induced into the signal lines.